No | Contract Name | Contract No | Bidder | |||
---|---|---|---|---|---|---|
01 |
Construction of Anhettigama Rural Water Supply Scheme in Kegalle District |
MCPWS/WASSIP/Kegalle/Deraniyagala/New/Anhettigama/2016/38 |
M/s Global Engineering Solution (Pvt) Ltd. No: 07,1st Lane Ramport Road, Ethulkotte, Kotte
|
|||
02 | Construction of Bandarawadiya Rural Water Supply Scheme in Monaragala District | MCPWS/WASSIP/Monaragala/Madulla/NEW/Bandarawadiya/2016/14 |
M/s Puritas (pvt) ltd No. 25, Froster Lane, Colombo 10.
|
|||
03 | Construction of Keenagoda Ruaral Water Supply Scheme in Monaragala District | MCPWS/WASSIP/Monaragala/Medagama/NEW/Keenagoda/2016/20 |
M/s Puritas (pvt) ltd No. 25, Froster Lane, Colombo 10.
|
|||
04 | Construction of Keenagoda Rural Water Supply Scheme in Monaragala District | MCPWS/WASSIP/Monaragala/Medagama/NEW/Keenagoda/2016/20 |
M/s Puritas (pvt) ltd No. 25, Froster Lane, Colombo 10.
|
|||
05 | Construction of Manthreethenna Rural Water Supply Scheme in NuwaraEliya District | MCPWS/WASSIP/NuwaraEliya/Walapane/New/Manthreethenna/2016/47 |
M/s Ruhunu Development Contractors and Engineers (Pvt) ltd No 42/2, Main Street, Battaramulla
|
|||
06 | Construction of Pahala Garagoda Rural Water Supply Scheme in Kegalle District | MCPWS/WASSIP/Kegalle/Yatiyanthota/NEW/Pahala Garagoda/2016/65 |
M/s Grant Engineering, No: 15 E Narendrasinghe Mawatha, Kundasale
|
|||
07 | Construction of Septage Treatment Plant at Kilinochchi | MCPWS/WASSIP/Urban/NCB/Septage-Kili/2016-05 |
M/s Puritas (pvt) ltd No. 25, Froster Lane, Colombo 10.
|
|||
08 | Construction of Watakepotha Mathurata Rural Water Supply Scheme in Nuwaraeliya District | MCPWS/WASSIP/NuwaraEliya/Walapane/NEW/Mathurata/2016/37 |
M/s Puritas (pvt) ltd No. 25, Froster Lane, Colombo 10.
|
|||
09 | Rehabilitation of Gangeyaya Community based Water Supply Scheme in Rathnapura District | MCPWS/WASSIP/Rathnapura/Embilipitiya/RE/Gangeyaya/2016/08 |
M/s Ananda Construction(Pvt) Ltd. 2/28B, 1st lane, Katuwawala Mawatha, Borelesgamuwa
|
|||
10 | Rehabilitation of KolonnaNildiyadahara Water Supply Scheme in Rathnapura District | MCPWS/WASSIP/Ratnapura/Kolonna/RE/Nildiyadahara/2016/11 |
M/s W.V.P. Construction Abegunawardhana Hardware, New Road, Barawakumbuka
|
|||
11 | Rehabilitation of Nagadeepa Water Supply Scheme in Badulla District | MCPWS/WASSIP/Badulla/Rideemaliyadda/NEW/Nagadeepa/2016/09 |
M/s Omat Engineering(Pvt.) Ltd, No. 47 Kalugampitiya, Baddulla.
|
|||
12 | Supply , Delivery and Laying of Waraketiara Rural Water Supply Scheme Pipe Network in Ratnapura District | MCPWS/WASSIP/Rathnapura/Embilipitiya/NEW/Waraketiara/2016/12 |
M/s Ruhunu Development Contractors and Engineers (Pvt) ltd No 42/2, Main Street, Battaramulla |
|||
13 | Rehabilitation of Ketagalara Rural Water Supply Scheme in Rathnapura District | MCPWS/WASSIP/Ratnapuara/Embilipitiya/RE/Ketagalara/2016/09 |
M/s Ruhunu Development Contractors and Engineers (Pvt) ltd No 42/2, Main Street, Battaramulla
|
|||
14 | Construction of Epalapitiya Rural Water Supply Scheme in Kegalle District | MCPWS/WASSIP/Kegalle/Dehiowita/NEW/Epalapitiya/2016/84 |
M/s Richoma Construction Engineers, No: 68/32 Nawa Neerodarama Road, Kalutara North, kalutara George Steuart Engineering (Pvt) ltd No. 11/1 Arcadia Gardnes, Rosmead Place, Colombo 07
|
|||
15 | Construction of Theligama Rural Water Supply Scheme in Kegalle District | MCPWS/WASSIP/Kegalle/Yatiyanthota/NEW/Theligama/2017/03 |
M/s Ruhunu Development Contractors and Engineers (Pvt) ltd No 42/2, Main Street, Battaramulla
|
|||
16 | Construction of Ponnagar Parathipuram Water Supply Scheme in Kilinochchi District | MCPWS/WASSIP/Kilinochchi/Karachchi/NEW/Ponnagar/2016/11 |
M/s RV Joint Venture (Pvt) Ltd No: 42 Main Street, Battaramulla
|
|||
17 | Construction of Rideemaliyadda South Water Supply Scheme in Badulla District | MCPWS/WASSIP/BADULLA/Rideemaliyadda/NEW/RideemaliyaddaSouth/2016/21 |
M/s Edward Christie, No 64/10, Nawala Road Nugegoda
|
|||
18 | Rehabilitation of Madola Rural Water Supply Scheme in Kegalle District | MCPWS/WASSIP/Kegalle/Dehiowita/RE/Madola/2017/01 |
M/s Grant Engineering, No: 15 E Narendrasinghe Mawatha, Kundasale |
|||
19 | Supplying & Laying of Pipes & Fittings from Pambahinna Junction to University of Sabaragamuwa | MCPWS/WASSIP/DSU-Ratnapura/Supplying & Laying of Pipes & Fittings/2017/06 |
M/S. Brians Engineers(Pvt) Limited No 93 C 4, Peterson Court Peterson Lane, Wellawatta, Colombo 06, |
|||
20 | Construction of Sooriyaara Rural Water Supply Scheme in Monaragala District | MCPWS/WASSIP/Monaragala/Thanamalwila/NEW/Sooriyaara/2016/21 |
M/s Edward Christie, No 64/10, Nawala Road Nugegoda |
|||
21 | Construction of Rekitipe Rural Water Supply Scheme in NuwaraEliya District | MCPWS/WASSIP/NuwaraEliya/Hanguranketha/NEW/Rekitipe/2016/35 |
M/s Edward Christie, No 64/10, Nawala Road Nugegoda |
|||
22 | Construction of Puthukudyirruppu Water Supply Scheme in Mullaithivu District | MCPWS/WASSIP/Mulathivu/Puthukudyirruppu/NEW/PuthukudyirruppuEast & West/2016/11 |
M/s Squire Mech Engineering (Pvt) Ltd, No 135/1 Old Kottawa Road Nawinna |
|||
23 | Construction of Keenagoda Rural Water Supply Scheme in Monaragla District | MCPWS/WASSIP/Monaragala/Medagama/NEW/Keenagoda/2016/20 |
M/s Puritas (pvt) ltd No. 25, Froster Lane, Colombo 10. |
|||
24 | Construction of Dunsinane Factory, Middle and Lower water supply scheme in Nuwaraeliya District | MCPWS/WASSIP/NuwaraEliya(plantation)/Dunsiane/NEW/Dunsiane-A/2016/60 | M/s RS Projects (Pvt) Ltd, No 14A, Orutota, Gampaha | |||
25 | Construction of Sepatage Treatment Plant at Mulathivu | MCPWS/WASSIP/Urban/Septage-Mula/2016/03 |
M/s Puritas (pvt) ltd No. 25, Froster Lane, Colombo 10. |
|||
26 | Construction of Welipothayaya Rural Water Supply Scheme in Rathnapura District | MCPWS/WASSIP/Rathnapura/Embilipitiya/NEW/Welipothayaya/2016/16 |
M/s Ruhunu Development Contractors and Engineers (Pvt) ltd No 42/2, Main Street, Battaramulla |
|||
27 | Construction of Thadduvankoddy Water Supply Scheme in Kilinochchi District | MCPWS/WASSIP/Kilinochchi/Karachchi/NEW/Thadduvankoddy/2017/01 |
M/s Edward Christie, (Civil Engineering & Road Development Contractors) No 64/10, Nawala Road Nugegoda |
|||
28 | Construction of Oddusudan Water Supply Scheme in Mullaithivu District | MCPWS/WASSIP/Mulathivu/Oddusudan/NEW/Oddusudan-E/2016/20 |
M/s Edward Christie, |
|||
29 | Construction of Galkadapathana Rural Water Supply Scheme in NuwaraEliya District | MCPWS/WaSSIP/NuwaraEliya/Walapane/NEW/Galkadapathana/2016/05 |
M/s Lahiru Construction, No 7/17 Maligatennewatta, Alugola, Nalanda |
|||
30 | Construction of Ganepalla Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Yatiyanthota/NEW/Ganepalla/2017/19 |
M/s SMA Construction (PVT) LTD No. 53/1, Dambulla Road, Yaggapitiya, Kurunagala |
|||
31 | Construction of Bogawana Lynsted Upper Rural Water Supply Scheme in NuwaraEliya | MCPWS/WaSSIP/NuwaraEliya(Plantation)/Bogawana/NEW/LynstedUpper/2016/66 |
M/s Ranawana Builders, No 15/13 Elkaduwa Road, Ukuwela |
|||
32 | Construction of Deiyanwala Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Aranayake/NEW/Deiyanwala/2016/76 |
M/s Mega Tech (pvt) Ltd. No 66/4, Havelock Road, Colombo 05 |
|||
33 | Supply and laying of pipes and fittings for road development under I-road Projects in Kegalle District | MCPWS/WaSSIP/DSU-Kegalle/Supply and Laying of Pipes/2016/66 |
M/s Lahiru Construction, No 7/17 Maligatennewatta, Alugola, Nalanda |
|||
34 | Construction of Katugaha Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Aranayake/NEW/Katugaha/2017/11 |
M/s Lahiru Construction, No 7/17 Maligatennewatta, Alugola, Nalanda |
|||
35 | Rehabilitation of Mawela Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Mawanella/RE/Mawela/2017/16 |
M/s Grant Engineering, No: 15 E Narendrasinghe Mawatha, Kundasale |
|||
36 | Construction of Glassaugh Upper Water Supply Scheme in NuwaraEliya District | MCPWS/WaSSIP/NUwaraEliya(Plantation)/Glassaugh/NEW/Glassaugh B/2016/61R/ |
M/s Ranawana Builders, No 15/13 Elkaduwa Road, Ukuwela |
|||
37 | Construction of Madampe Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Ratnapura/Goda,Kaha/New/Madampe/2016/15 |
M/s, Nawaloka-vasiri JV, 115, Sir James Peiries Mawatha, Colombo 02 |
|||
38 | Rehabilitation of Lunugala CBO Water Supply Scheme in Badull District | MCPWS/WaSSIP/Badulla/Lunugala/RE/lunugala/2016/10R |
M/s, W V P Construction, Abeygunawadena Hardware New Road, Barawakumbuka. |
|||
39 | Rehabilitation of Kosgahadebala Dunudiyadahara Rural Water Supply Scheme in NuwaraEliya District | MCPWS/WaSSIP/NuwaraEliya/Hanguranketha/RE/Dunudiyadahara/2016/48R |
M/s. Ranawana Builders No 15/13, Elkaduwa Road, Ukuwela |
|||
40 | Construction of Lynsted lower water supply scheme in NuwaraEliya | MCPWS/WaSSIP/NuwaraEliya(Plantation)/Ambagamuwa/NEW/Lynsted/ lower/2017/07 |
M/s. Ranawana Builders No 15/13, Elkaduwa Road, Ukuwela |
|||
41 | Construction of Birdwell Water Supply Scheme in NuwaraEliya District | MCPWS/WaSSIP/NuwaraEliya(Plantation)/Bogawana/NEW/Bridwell/2017/04 |
M/s C&C Engineering (PVT) Ltd. No 58B/2, Queen Mary's Road, Gampaha |
|||
42 | Construction of Rikillagaskada Rural Water Supply Scheme in NuwaraEliya District | MCPWS/WaSSIP/NuwaraEliya/Hanguranketha/NEW/Rikillagaskada/2017/09 |
M/s H.N.G. Construction No 38/1, Wewgama, Nawamedagama Dehiattakandiya. |
|||
43 | Construction of Walpola Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Dehiowita/New/Walpola/2017/20 |
M/s Ananda Construction(Pvt) Ltd. 2/28B, 1st lane, Katuwawala Mawatha, Borelesgamuwa |
|||
44 | Construction of Dombagaswinna Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Rathnapura/Pelmadulla/NEW/Dombagswinna/2017/01 |
M/s Lolitha Construction |
|||
45 | Rehabilitation of Masimbula Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Rathnapura/God-Weli/RE/Masimbula/2017/08 |
M/s Brians Engineers (pvt) Limited |
|||
46 | Construction of Hopton & Raindapola Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Lunugala/NEW/hopton&Raindapola/2017/04 |
M/s C & C Engineering (pvt) Ltd |
|||
47 | Construction of Ambethenna Water Supply Scheme in Badulla Disrict | MCPWS/WaSSIP/Badulla/Passra/NEW/Ambethenna/2017/09 |
M/s Chathura Construction Company (pvt) ltd. |
|||
48 | Rehabilitation of Samagipura Rural Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Sewanagala/RE/Samagipura/2017/02 |
M/s W V P Construction |
|||
49 | Constrution of Dunsinane Upper Water Supply Scheme and Dunsinane Nort Water Supply Scheme | MCPWS/WaSSIP/NuwaraEliya(Plantation)/Dunsinane B,C/NEW/Dunsinane Upper/2017/08/ |
M/s C & C Engineering (pvt) Ltd |
|||
50 |
Construction of Yalagamuwa Rural Water Supply Scheme in Badulla District |
MCPWS/WaSSIP/Badulla/Uva paranagama/NEW/Yalagamuwa/2017/11 |
M/s Tanaka Contractors |
|||
51 | Construction of Bellanoya Rural Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Medagama/NEW/Bellanoya/2017/06 |
M/s R S Project (pvt) Ltd |
|||
52 | Rehabilitation of Sankapala Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Rathnapura/Embilipitiya,Kolonna/RE/Group 03/2017/21 |
M/s R S Project (pvt) Ltd |
|||
53 | Construction of Sheengama Rural Water Supply Scheme | MCPWS/WaSSIP/Nuwaraeliya/Kothmale/NEW/Sheengama/2017/11 |
M/s, SAW Engineering (Pvt) Ltd No 52, Makola North, Makola, Kiribathgoda. |
|||
54 | Rehabilitation of Rahala, heenatipana and Gonaramba Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Ara,Mawa,Ruwan/RE?Group 01/2017/57 |
M/s H.N.G. Construction |
|||
55 | Rehabilitation of Egodakotagama, Vasipana,Attala and Hulandawa Left Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Badalkumbura/RE/Group 01/2017/11 |
M/s H.N.G. Construction |
|||
56 | Construction of Amabagahayaya Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Rathnapura/Kolonna/NEW/Ambagahayaya/2017/19 |
M/s SAW Engineering (pvt) Ltd |
|||
57 | Construction of Miyanawita Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Deraniyagala/New/Miyanawita/2017/27 |
M/s Edward Christie , No 64/10, Nawala Road. Nugegoda |
|||
58 |
Rehabilitation of Malulla & Adikarigama Rural Water Supply Scheme in Nuwar Eliya |
MCPWS/WaSSIP/NuwarEliya/Hanguranketha/RE/Group 02/2017/25 |
M/s Furni Dyanmic Engineering (Pvt) LTD No 235, Colombo Road, Pilimathalawa |
|||
59 | Construction of Nawakadadora Water Supply Scheme in NuwaraEliya District | MCPWS/WaSSIP/NuwarEliya/Kothmale/New/Nawakadadora/217/19 |
M/s C&C Engineering (Pvt) Ltd. |
|||
60 | Construction of Malayalapuram Rural Water Supply Scheme in Kilinochchi District | MCPWS/WaSSIP/Kilinochchi/Karachchi/NEW/Malayalapuram/2017/04 |
M/s Edward and Christie |
|||
61 | Rehabilitation of Adiribedda/Dunukebedda/Pallawela Rural Water Supply Scheme in NuwaraEliya District | MCPWS/WaSSIP/NuwaraEliya/Hanguranketha/RE/Group 01/2017/06 |
M/s H.N.G. Construction |
|||
62 | Construction of Hakbellawaka Rural Water Supply Schemes in Kegalle District | MCPWS/WaSSIP/Kegalle/Yatiyantota/New/Hakbellawaka/2017/59 | M/s Engineering Design & Construction Co (Pvt) Ltd 145/A, 6th Mile Post, Kandy Road, Dalugama, Kelaniya |
|||
63 | Construction of Ambagahayaya Rural Water Supply Scheme in Rathnapura | MCPWS/WaSSIP/Ratnapura/Kolonna/NEW/Ambagahayaya/2017/19 | M/s SAW Engineering (pvt) Ltd No 52, Makola North, Makola, Kiribathgoda |
|||
64 | Rehabilitation of Andaluwa Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Ratnapura/Embili,Godaka/RE/Group 01/2017/15 | M/s R S Project (pvt) Ltd No 13/A, Orutota, Gampaha |
|||
65 | Construction of Edinburgh Water Supply Scheme in Nuwaraeliyta District | MCPWS/WaSSIP/NuwaraEliya(Plantation)/NEW/Edinburgh/2017/18 |
M/s C&C Engineering (Pvt) Ltd. |
|||
66 | Rehabilitation of Dambagalla and Dombagahawela Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Madulla, Siyabalanduwa/RE/Group 02/2017/12R |
M/s Amaya Desh Constructions & Interior Solutions (Pvt) Ltd. |
|||
67 | Construction of Uva Benhead Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Welimada/NEW/Uva Benhead/2017/19 |
M/s Node Engineering Consortium Engineers and Contractors No 67, Lower Street,Badulla. |
|||
68 | Rehabilitation of Thunkama Suwadivi Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Rathnapura/Embilipitiya/RE/Thunkama/2016/10 | M/s KP-Chathura JV No 185/6, Katuwana Road,Homagama |
|||
69 | Rehabilitation of Andaluwa Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Rathnapura/Embili, Godaka/RE/Group01/2017/15 | M/s R S Project (pvt) Ltd No 13/A, Orutota, Gampaha |
|||
70 | Construction of Kalmadunagar Rural Water Supply Scheme in Kilinochchi District | MCPWS/WaSSIP/Kilinochchi/Kandawalai/NEW/Kalmadunagar/2017/13 | M/s SAW Engineering (Pvt) Ltd No. 52, Makola North, makola, Kiribathgoda |
|||
71 |
Construction of Galpaya Water Supply Scheme in Ratnapura District |
MCPWS/WaSSIP/Rathnapura/Weligepola/NEW/Galpaya/2017/22R |
M/s.Sanken Construction (Pvt) Ltd, |
|||
72 | Construction of Uduadana Rural Water Supply Schemes in Badulla District | MCPWS/WaSSIP/Badulla/Welimada/NEW/Udubadana/2017/12 |
M/s C&C Engineering(Pvt) Ltd, No.58B/2, Queen Mary's Road, Gampaha. |
|||
73 | Construction of Padalangala Elevated Water Tower in Rathnapura District | MCPWS/WASSIP/DSU-Rathnapura/Construction of Padalangala Elevated Water Tower/2017/07 | M/s Lohitha Construction No 01, Singhagama. Pandulagama. Anuradhapura |
|||
74 | Rehabilitation of Goluwawila and Associated Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Ratnapura,pelmadulla/RE/Group-04/2017/23 | M/s R S Project (pvt) Ltd No 13/A, Orutota, Gampaha |
|||
75 | Rehabilitation of Aluthwela CBO Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Haputhale/RE/Aluthwela/2017/13/R | M/s Furni Dyanmic Engineering (Pvt) LTD No 235, Colombo Road, Pilimathalawa |
|||
76 | Construction of Strathdon A Water Supply Scheme in Nuwaraeliya District | MCPWS/WaSSIP/NuwaraEliya(Plantation)/Strathdon/NEW/Strathdon/NEW/Strathdon A/2017/39 | M/s Furni Dyanmic Engineering (Pvt) LTD No 235, Colombo Road, Pilimathalawa |
|||
77 | Construction of Keerihena Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Deraniyagala/New/Keerihena/2017/62 |
M/s Lahiru Construction, No 7/17 Maligatennewatta, Alugola, Nalanda. |
|||
78 | Rehabilitation of Hagala and Associated Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Rathnapura/Embilipitiya/RE/Group 02/2017/20 | M/s R S Project (pvt) Ltd No 13/A, Orutota, Gampaha |
|||
79 | Construction of karandugala rural Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Bibile/NEW/Karandugala/2017/01R | M/s Sygnap Engineering (pvt0 Ltd No 128/B/1, Ramahera Rd, Hewagama, Kaduwela. |
|||
80 | Construction of Mariarawa Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Madulla/NEW/Mariarawa/2017/20 |
M/s R S Project (pvt) Ltd |
|||
81 | Construction of Parape Kanugolla Integrated Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Rambukkana/NEW/Parape/2017/85 | M/s Engineering Design & Construction Co (Pvt) Ltd 145/A, 6th Mile Post, Kandy Road, Dalugama, Kelaniya |
|||
82 | Rehabilitation of Kawdawa and Dombagahawela Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Mona,Siya/RE/Group04/2017/27 |
M/s Sygnap Engineering (pvt) Ltd. No 128/B/1, Ramahera Rd, Hewagama, Kaduwela. |
|||
83 | Construction of Muthukandiya Rural Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Siyabalanduwa/NEW/Muthukandiya/2017/34 | M/s Edward & Christie No 64/10, Nawala Road, Nugegoda. |
|||
Construction of Galamuna Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Ratnapura/Embilipitya/NEW/Galamuna/2017/33 |
M/s WVP Construction |
||||
84 | Construction of Lunugala Town Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Lunugala/NEW/Lunugala PS/2017/29 |
M/s Engineering Design & Construction Co (Pvt) Ltd |
|||
85 |
Construction of Puthukudiyiruppu A Rural Water Supply Scheme in Mullaithivu District |
MCPWS/WaSSIP/Mulathivu/Puthukudiyiruppu/New/Puthukudiyiruppu A/2017/03R | M/s Edward & Christie 64/10, Nawala Road, Nugegoda |
|||
86 | Construction of Diyathalawa Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Bandarawela/NEW/Diyathalawa/2017/08R |
M/s CML-MTD Construction Limited |
|||
87 | Rehabilitation of Durakanda and Associated Rural Water Supply Schemes in Rathnapura District | MCPWS/WaSSIP/Rathnapura/Balangoda/RE/Group/14/2017/51 | M/S WVP Construction Abeygunawardhana Hardware, New Road, Barawakumbuka |
|||
88 | Construction of Bandarawadiya Rural Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Medagama/NEW/Bandiyawa/2017/22 |
M/s Omat Engineering (Pvt) LTD |
|||
89 | Construction of Ithakattuwa Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Thenagallanda/NEW/Ithakattuwa/2017/ | M/s Node Engineering Consortium, No 67, Lower Street, Badulla. |
|||
90 | Construction of Iyakkachchi Rural Water Supply Scheme in Kilinochchi District | MCPWS/WaSSIP/Kilinochchi/Pachchilaipalli/NEW/Iyakkachchi/2017/34 | M/s SAW Engineering(Pvt) ltd No 52, Makola North, Makola, Kiribathgoda |
|||
91 | Construction of Beragala Rural Water Supply Scheme in Kegalle District |
MCPWS/WaSSIP/Kegalle/Kegalle/NEW/Beragala/2017/91 |
M/s K.P Chathura JV(pvt) Ltd M/s KP Projects International (pvt) Ltd M/s Chathura Construction Company(pvt) Ltd |
|||
92 | Construction of Suduwathuraara Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Monaragala/NEW/Suduwathuraara/'2017/26 | M/s Chathura Constructions Company(Pvt) Ltd No. 36, Bazaar Street, Badulla |
|||
93 | Rehabilitation of Dickwella, Bogahamaditta and Associated (Group 02) Water Supply Schemes in Badulla District | MCPWS/WaSSIP/Badulla/Passara/RE/Group 02/2017/25 | M/s C K W Engineering Near the Water Board, Dikyaya, Buttala |
|||
94 | Construction of Bulupitiya Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Bibile/NEW/Bulupitiya/2017/24 | M/s Puritas (Pvt) Ltd No 25, Foster Lane, Colombo 10 |
|||
95 | Rehabilitation of Udumulla and Associated Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Rathnapura/Godakawela/RE/Group 07/2017/26 | M/s WVP Construction Abeygunawardhana Hardware, New Road, Barawakumbuka |
|||
96 | Construction of Glassaugh-A Water Supply Scheme in NuwaraEliya | Construction of Glassaugh-A Water Supply Scheme in NuwaraEliya |
M/s JN Construction (pvt) Ltd And M/s Luminex(Pvt) Ltd, |
|||
97 | Rehabilitation of Kiriibbanwewa, Swashakthi Rural Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Sewanagala/RE/Kiriibbanwewa/2018/01 | M/s Lachan Construction Kalegama, Medawachchiya, Anuradhapura. |
|||
98 | Providing House Connections in Welipotheyaya Rural Water Supply Scheme | MCPWS/WaSSIP/Ratnapura/Embilipitiya/NEW/Welipotheyaya-08/2018/47 |
M/s P.M.J.S. Construction |
|||
99 | Supply & Laying of Pipes for padalangala Rural Water Supply Scheme | MCPWS/WaSSIP/Ratnapura/Embilipitiya/NEW/Padalangala/2017/16 | M/s Engineering Design & Constructrion Company (pvt) Ltd 145/A, 6th Mile Post, Kandy Road, Dalugama |
|||
100 | Rehabilitation of Nivithigala Rural Water Supply Scheme in Ratnapura District | MCPWS/WaSSIP/Rathnapura/Nivithigala/RE/group 05/2017/2 | M/s Dimo-Brians Joint Venture, No. 65, Jetawana Road, Colombo 14. |
|||
101 | Construction of Thirumurikandi Rural Water Supply Scheme in Mulaithivu District | MCPWS/WaSSIP/Mulaithuvu/Oddusudan/NEW/Thirumurukandi/2017/13 | M/s SAW Engineering(Pvt) ltd No 52, Makola North, Makola, Kiribathgoda |
|||
102 | Rehabilitation of Madulla and Associated (Group 03) Rural Water Supply Schemes in NuwaraEliya District | MCPWS/WaSSIP/NuwaraEliya/Walapane/RE/Group 03/2017/31 | M/s JN Construction (pvt) Ltd 52/4, Manaweriya, Kochchikade. |
|||
103 | Construction of Public Sanitation Puthukkadu in Kilinochchi District | MCPWS/WaSSIp/Kilinochchi/Pachchilaipalli/NEW/SA/Puthukkadu/2017/36 | M/s K.P.K. bulding Construction Works No 108, Rathnapuram Road, Kilinochchi |
|||
104 | Rehabilitation of Madulla and Associated (Group 03) Rural Water Supply Schemes in NuwaraEliya District | MCPWS/WaSSIP/NuwaraEliya/Walapane/RE/Group 03/2017/31 | M/s JN Construction (pvt) Ltd No 52/4, Manaweriya, Kochchikade. |
|||
105 | Construction of Mocha A Water Supply Scheme in NuwaraEliya | MCPWS/WaSSIP/NuwaraEliya(Plantation)/Ambagamuwa/NEW/Mocha A/2017/41 | M/s Dimo(pvt) Ltd. No 65, Jethawana Road, Colombo 14. & M/s Brians Engineers (pvt) Ltd. No 93 C4, Peterson Court, Peterson Lane, Wellawatta.Colombo 06 |
|||
106 | Construction of Randola Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Rathnapura/Balangoda/NEW/Randola/2017/44 | M/s Lohitha Construction No 01, Singhagama,Pandulagama, Anuradhapura |
|||
107 | Construction of Anaivilunthan Rural Water Supply Scheme | MCPWS/WaSSIP/Kilinochchi/Karachchi/NEW/Anaivilunthan/2018/03 | M/s C&C Engineering (Pvt) Ltd No 26/1, Kandy Road, Yakkala. |
|||
108 | Construction of Hope Water Supply Scheme in Nuwara Eliya District | MCPWS/WaSSIP/Nuwara Eliya (Plantation)/Hope/NEW/Hope/2017/40R | M/s Puritas (Pvt) Ltd No 25, Foster Lane, Colombo 10 |
|||
109 | Construction of Nikawewa & Bodagama Ruaral Water Supply Scheme in Monaragala District | MCPWS/WASSIP/Monaragala/Thanamalwila/NEW/Nikawewa/2017/21 |
M/s Dimo(pvt) Ltd. & M/s Brians Engineers (pvt) Ltd. |
|||
110 | Construction of Deliwa Ruaral Water Supply Scheme in Monaragala District | MCPWS/WASSIP/Monaragala/Madulla/NEW/Deliwa/2017/33 |
M/s. Savinda Enterprices (Pvt) Ltd, No: 176/F, Sri Saranatissa Mawata, Kahathuduwa, Polgasowita. |
|||
111 | Construction of Orubandiwewa Ruaral Water Supply Scheme in Badulla District | MCPWS/WASSIP/Bdulla/Rideemaliyadda/NEW/Orubandiwewa/2017/16 |
M/s.Sanken Construction (Pvt) Ltd, |
|||
112 | Construction of School Sanitation in Pelmadulla (Group 02) of Rathnapura District | MCPWS/WaSSIP/Rathnapura/NEW/SA/School Sanitation-Pelmadulla-2/2018/80 |
M/s. L.B.G. Enterprises (Pvt) Ltd, 204/1, Athurugiriya Road, Pannipitiya, Kottawa. |
|||
113 | Construction of School Sanitation in Parape Vidyalaya of Kegalle District | MCPWS/WaSSIP/Kegalle/NEW/SA/EZ- Parape Vidyalaya/2018/45 |
M/s. A. S. Construction, No: 32, Galpola, Molagoda, Kegalle. |
|||
114 | Construction of School Sanitation in Nuwara Eliya/Hatton Educations Zone of Nuwara Eliya District | MCPWS/WaSSIP/Kegalle/NEW/SA/EZ- Nuwara Eliya & Hatton/2018/12R |
M/s. Kasthuri Arachchi Construction, Sandun Niwasa, Temples Road, Ela Ihala, Kolonna. |
|||
115 | Providing House Connection in Welipotheyaya Rural Water Supply Scheme (Zone 1) in Rathnapura District | MCPWS/WaSSIP/Rathnapura/Embilipitiya/BW/NS/Welipotheyaya - 11/2018/93 |
M/s. Kasthuri Arachchi Construction, Sandun Niwasa, Temples Road, Ela Ihala, Kolonna. |
|||
116 | Rehabilitation of Ulugala, Janahitha Shakthi Rural Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Buttala/RE/Ulugala/2018/21 |
M/s. CISS Engineering, No. 86, Kalulandayaya, Raththanapitiya, Monaragala. |
|||
117 | Rehabilitation of Kothmale and Associated (Group 04) Rural Water Supply Scheme in Nuwara Eliya District | MCPWS/WaSSIP/Nuwara Eliya/Kothmale/RE/Group 4/2018/14 | M/s JN Construction (pvt) Ltd No 52/4, Manaweriya, Kochchikade. |
|||
118 | Construction of Wandala Rural Water Supply Scheme In Kegalle District | MCPWS/WaSSIP/Kegalle/Ruwanwella/NEW/Wandala/2018/20 |
M/s JCK Construction (pvt) Ltd |
|||
119 | Rehabilitation of Mallehewa, Udamallehewa and Associated Rural Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Mallehewa,Udamallehewa/RE/Group 13/2018/11 | M/s WVP Construction Abeygunawardhana Hardware, New Road, Barawakumbuka |
|||
120 | Rehabilitation of Hamapola, Pitakumbura and Associated Rural Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Hamapola, Pitakumbura/RE/Group 14/2018/12 |
M/s. CISS Engineering, No. 86, Kalulandayaya, Raththanapitiya, Monaragala. |
|||
121 | Construction of Egodawela Ruaral Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Saranathota/NEW/Egodawela/2017/49 |
M/s Tanaka Contractors |
|||
122 | Rehabilitation of Adigala and Associated (Group 03) Rural Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Bandarawela/RE/Group 03/2017/26 | M/s Furni Dyanmic Engineering (Pvt) LTD No 235, Colombo Road, Pilimathalawa |
|||
123 | Construction of Public Convenience Centre - Rambukkana in Kegalle District | MCPWS/WaSSIP/Kegalle/Rambukkana/NEW/SA/Rambukkana/2018/42 |
M/s Farmhill Constructions No. 168, Kandy Road, Weligalla |
|||
124 | Construction of Rideepana Ruaral Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Saranathota/NEW/Rideepana/2018/10 | M/s Chathura Constructions Company(Pvt) Ltd No. 36, Bazaar Street, Badulla |
|||
125 | Construction of Pipe Line Extensions from NWS&DB Extensions to Pitiyegama GND in Kegalle District | MCPWS/WaSSIP/Kegalle/Rambukkana/NEW/Pitiyegama/2018/29 | M/s JCK Construction (pvt) Ltd No 154, Horana Road, Weedagama, Bandaragama |
|||
126 | Rehabilitation of Thulhiriya Rural Water Supply Scheme & Construction of Laboratory for Kotiyakumbura RWSS in Kegalle District | MCPWS/WaSSIP/Kegalle/Warakapola/RE/Thulhiriya & Dedigama/2018/18 | M/s. Malki Construction, 467/A/4, Malawa, Kuruwita. | |||
127 | Rehabilitation of Dimbulana & Associated (Group 04) RWSS in Badulla District | MCPWS/WaSSIP/Badulla/Uva Paranagama/RE/Group 04/2017/03 |
M/s. De Mel Construction (Pvt) Ltd, No: 7/86A, Kapuwatta Road, Gangodawial, Nugegoda. |
|||
128 | Construction of Bogawana Rural Water Supply Scheme in NuwaraEliya District | MCPWS/WaSSIP/Nuwara Eliya (Plantation)/Ambagamuwa/New/Bogawana/2017/10R | M/s JN Construction (pvt) Ltd No 52/4, Manaweriya, Kochchikade. |
|||
129 | Supply & Laying of Pipes - Dunsinane Factory Divition New Housing scheme | MCPWS/WASSIP/DSU - NuwaraEliya/Supply & Laying of Pipes - Dunsinane Factory/2018/43 | M/s RS Projects (Pvt) Ltd, No 14A, Orutota, Gampaha | |||
130 | Construction of Bulathkohupitiya Integrated Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Bulathkohupitiya/NEW/Bulathkohupitiya/2018/17 |
M/s Dimo(pvt) Ltd. & M/s Brians Engineers (pvt) Ltd. |
|||
131 | Construction of School Toilets for Bandarawela Central College in Badulla District | MCPWS/WaSSIP/Badulla/NEW/SA/EZ-Bandarawela Central College/2018/64 | M/s Furni Dyanmic Engineering (Pvt) LTD No 235, Colombo Road, Pilimathalawa |
|||
132 | Construction of Laboratory for Thunkama Suwadivi RWSS and Galpaya RWSS in Rathnapura District | MCPWS/WaSSIP/DSU - Rathnapura/WQT Lab - Thunkama/2018/50 |
M/s. Indrajith Constructions. No: 218, Gangeyaya, Embilipitiya |
|||
133 | Construction of School Sanitation in Madampe of Rathnapura District | MCPWS/WaSSIP/Rathnapura/NEW/SA/School Sanitation - Madampe/2018/81 |
M/s. Indrajith Constructions No. 218, Gangeyaya, Embilipitiya |
|||
134 | Construction of School Sanitation in Kothmale | MCPWS/WaSSIP/NuwaraEliya/Kothmale/NEW/EZ - Kothmale/2018/18 |
M/s. Malki Construction No: 467/A/4, Malawa, Kuruwita |
|||
135 | Supply of uPVC Pipes, Fittings and Specials for Rehabilitation of RWS Schemes | MCPWS/WaSSIP/DSU - Monaragala/uPVC Pipes, Fittings & Specials/2018/28 |
M/s. Central Industries PLC No: 312, Nawala Road, Nawala, Rajagiriya |
|||
136 | Construction of Galboka Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Aranayaka/NEW/Galbokka/2017/81 |
M/s. Sanbeam Construction Company (Pvt) Ltd No: 331/C, High Level Rd, Nugegoda. |
|||
137 | Supply & Laying of Pipes - Dunsinane Middle Divition New Housing scheme | MCPWS/WASSIP/DSU - NuwaraEliya/Supply & Laying of Pipes - Dunsinane Middle/2018/42 |
M/s. Malki Construction No: 467/A/4, Malawa, Kuruwita |
|||
138 | Rehabilitation of Thelihawewa and kurukudegama Rural Water Supply Scheme in Badulla | MCPWS/WaSSIP/Badulla/Bandarawela & Haliela/RE/Thelihawewa and Kurukudegama/2018/09 | M/s Furni Dyanmic Engineering (Pvt) LTD No 235, Colombo Road, Pilimathalawa |
|||
139 | Construction of Orubandiwewa Ruaral Water Supply Scheme - Phase II in Badulla District | MCPWS/WASSIP/Bdulla/Mahiyangana/NEW/Orubandiwewa-Phase II/2018/85 |
M/s Dimo(pvt) Ltd. & M/s K D A Weerasinghe and Company (pvt) Ltd. |
|||
140 | Construction of Jeyapuram Rural Water Supply Scheme in Kilinochchi District | MCPWS/WaSSIP/Kilinochchi/Pooneryn/NEW/Jeyapuram/2018/10 | M/s Squire Mech Engineering (Pvt) Ltd, No 135/1 Old Kottawa Road Nawinna | |||
141 | construction of Public Toilets - Lunugala Town in Badulla District | MCPWS/WaSSIP/Badulla/NEW/SA/Lunugala town/2018/67 | M/s. Ranawana Builders No 15/13, Elkaduwa Road, Ukuwela | |||
142 | Construction of Dambana Village - Sanitation Improvement in Badulla District | MCPWS/WaSSIP/Badulla/NEW/SA/EA - Dambana Village/2018/68 | M/s Furni Dyanmic Engineering (Pvt) LTD No 235, Colombo Road, Pilimathalawa |
|||
143 | Printing, Delivery and Erection of a Sign Boards for Water Sources at Aranayaka, Mawanella, Rambukkana, Kegalle, Ruwanwella, Bulathkohupitiya, Dehiowita, Yatiyanthota and Warakapola | MCPWS/WaSSIP/DSU Kegalle/NS/Sign Boards - Water Sources/2018/74 | M/s Grant Engineering, No: 15 E Narendrasinghe Mawatha, Kundasale | |||
144 | Construction of Balance Work of Theligama RWSS in Kegalle District | MCPWS/WaSSIP/Kegalle/Yatiyantota/NEW/Theligama 06/2018/24 | M/s JCK Construction (pvt) Ltd No 154, Horana Road, Weedagama, Bandaragama |
|||
145 | Rehabilitation of Molligoda Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Mawanella/RE/Molligoda/2017/79 | M/s Grant Engineering, No: 15 E Narendrasinghe Mawatha, Kundasale | |||
146 | Supply of DI Pipes, Fittings and Specials for Rehabilitation of RWSS | MCPWS/WaSSIP/DSU-Monaragala/DI Pipes, Fittings & Specials/2018/29 |
M/s. Savinda Enterprices (Pvt) Ltd, No: 176/F, Sri Saranatissa Mawata, Kahathuduwa, Polgasowita. |
|||
147 | Welimada Central College Sanitation Improvement (School) in Badulla District | MCPWS/WaSSIP/Badulla/NEW/SA/EZ - Welimada Central College/2018/65 |
M/s Randidu Engineers, No: 59/1, Weherayaya, Etiliwewa. |
|||
148 | Construction of Uva Gamunupura Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Mahiyanganaya/NEW/Uva Gamunupura/2018/01 | M/s RS Projects (Pvt) Ltd, No 14A, Orutota, Gampaha | |||
149 | Construction of Mocha B Water Supply Scheme in Nuwaraeliya District | MCPWS/WaSSIP/Nuwara Eliya (Plantation)/Ambagamuwa/NEW/Mocha B/2017/43 |
M/s Lahiru Construction, No 7/17 Maligatennewatta, Alugola, Nalanda. |
|||
150 | Supply & Delivery of Water Quality Testing Equipments, Chemicals & Glasswear | MCPWS/WaSSIP/PMU/NCB/Water Quality Equipment/2018/85 |
M/s HIFI Center (Pvt) Ltd (Debug Group Company) No: 297, Galle Road, Rathmalana. |
|||
151 | Supply & Delivery of Water Quality Testing Equipments, Chemicals & Glasswear | MCPWS/WaSSIP/PMU/NCB/Water Quality Equipment/2018/85 |
M/s Singer Mega No: 40, Nawala Road, Nugegoda. |
|||
152 | Supply & Delivery of Water Quality Testing Equipments, Chemicals & Glasswear | MCPWS/WaSSIP/PMU/NCB/Water Quality Equipment/2018/85 |
M/s Quolikem International (Pvt) Ltd No: 136/4, Highlevel Road, Kirulapane, Colombo 06 |
|||
153 | Supply & Delivery of Water Quality Testing Equipments, Chemicals & Glasswear | MCPWS/WaSSIP/PMU/NCB/Water Quality Equipment/2018/85 |
M/s Scientific Instruments (Pvt) Ltd No: 1/2, Abeyratna Mw, Boralesgamuwa. |
|||
154 | Supply & Delivery of Water Quality Testing Equipments, Chemicals & Glasswear | MCPWS/WaSSIP/PMU/NCB/Water Quality Equipment/2018/85 |
M/s Hemsons International (Pvt) Ltd Hemas Building, 36, Sir Razik Fareed Mw, P.O. Box 1945, Colombo 01 |
|||
155 | Supply & Delivery of Water Quality Testing Equipments, Chemicals & Glasswear | MCPWS/WaSSIP/PMU/NCB/Water Quality Equipment/2018/85 |
M/s Analytical Instrument (Pvt) Ltd No: 100, Elvitigala Mw, Colombo 08 |
|||
156 | Partitioning for Establishment of National M & E cell at the DNCWS | MCPWS/WaSSIP/PMU/NS/M&E Partitioning/2019/15 |
M/s Athukorala Fabrications No: 307/3, Mihindu Mw, Makola North, Makola |
|||
157 | Construction of Balance Laying Works (II) of Manthreethenna | MCPWS/WaSSIP/Nuwara Eliya/Walapane/BW/Manthreethenna - 03/2019/03 |
M/s Sion Lanka Enginnering (Pvt) Ltd No: 81, Elapiliyawa, Meerigama. |
|||
158 | Construction of Water Quality Testing Laboratories in Undugoda RWSS in Kegalle District | MCPWS/WaSSIP/DSU Kegalle/WOT Lab - Undugoda/2018/56R |
M/s Amila Constructions No: 45, Karandupana, Kegalle |
|||
159 | Construction of Jeyapuram Rural Water Supply Scheme in Kilinochchi District | MCPWS/WaSSIP/Kilinochchi/NEW/SA/EZ-Kilinochchi/2018/25 P1 |
M/s Kiruniya Civil Engineering Constructions No: 135, 1st Cross Street, Ukkulankulam, Vauniya |
|||
160 | Construction of Jambugasthenna Rural Water Supply Scheme in Nuwara Eliya District | MCPWS/WaSSIP/Nuwara Eliya/Ambagamuwa/NEW/Mocha B/2017/43 |
M/s Lego International (Pvt) Ltd No: 867, William Gopallawa Mawatha, Kandy. |
|||
161 | Rehabilitation of Piyarapandowa Rural Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Ella/RE/Piyarapandowa/2018/06 | M/s WVP Construction Abeygunawardhana Hardware, New Road, Barawakumbuka |
|||
162 | Rehabilitation of Mirahanwaththa Rural Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Welimada/RE/Mirahanwaththa/2018/04 | M/s WVP Construction Abeygunawardhana Hardware, New Road, Barawakumbuka |
|||
163 | Rehabilitation of Koskanuwela Rural Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Welimada/RE/Koskanuwela/2018/07 | M/s WVP Construction Abeygunawardhana Hardware, New Road, Barawakumbuka |
|||
164 | Rehabilitation of Dedigama and Bopitiya Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Warakapola/RE/Dedigama/2017/58 | M/s Grant Engineering, No: 15 E Narendrasinghe Mawatha, Kundasale | |||
165 | Construction of Hakamuwa Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Rathnapura/Pelmadulla/NEW/Hakamuwa/2017/37 | M/s C&C Engineering (Pvt) Ltd No 26/1, Kandy Road, Yakkala |
|||
166 | Supply & Laying of Pipes for Bridwell New Housing scheme in Bogawana WSS | MCPWS/WASSIP/NuwaraEliya (PHDT)/Bogawana/BW/Bridwell-01/2018/21 |
M/s Sion Lanka Enginnering (Pvt) Ltd No: 81, Elapiliyawa, Meerigama. |
|||
167 | Construction of Public Convenience Center Warakapola in Kegalle District | MCPWS/WaSSIP/Kegalle/Warakapola/NEW/SA/Warakapola/2018/41 |
M/s. Kasthuri Arachchi Construction, Sandun Niwasa, Temples Road, Ela Ihala, Kolonna. |
|||
168 | Construction of Access Road for Treatment Plant at Ganepalla RWSS in Kegalle District. | MCPWS/WaSSIP/Yatiyantota/NEW/Ganepalla - 02/2018/23 |
M/s SMA Constructions (Pvt) Ltd, No. 53/A, Dambulla Road, Yaggapitiya, Kurunegala. |
|||
169 | Construction of Kotambe Rural Water Supply Scheme in Nuwara Eliya District | MCPWS/WaSSIP/Nuwara Eliya/Walapane/NEW/Kotambe/2018/13 |
M/s PND Construction (Pvt) Ltd, No. 426, D D Weragala Avenue, Pannipitiya Road, Pelawatta, Battaramulla. |
|||
170 | Construction of Sanitation Facilities at St. Mary’s College-Primary Section & Associated | MCPWS/WaSSIP/Kegalle/NEW/SA/EZ-Primary Section-G01/2018/70 | M/s Amila Constructions, No.45, Karandupana, Kegalle. |
|||
171 | Construction of Latrine in Dambana Area Stage III in Badulla District | MCPWS/WaSSIP/Badulla/SA/Dambana - Stage III/2018/93 | M/s Supun Construction & Suppliers (Pvt) Ltd, No.28, Badulupitiya Road, Badulla. |
|||
172 | Rehabilitation of Dahagonaya, Gallindamulla RWSS in Monaragala District. | MCPWS/WaSSIP/Monaragala/Medagama/RE/Dahagonaya/2018/23 | M/s WVP Construction Abeygunawardhana Hardware, New Road, Barawakumbuka |
|||
173 | Construction of Disable Toilets in Aranayaka & Warakapola in Kegalle District | MCPWS/WaSSIP/Kegalle/SA/Disable Sanitation - Aranayaka & Others/2018/46 | M/s A. S. Construction No: A 32, Galpola, Molagoda, Kegalle. |
|||
174 | Construction of Ulavanour Rural Water Supply Scheme in Kilinochchi District | MCPWS/WaSSIP/Kilinochchi/Kandawalai/NEWUlavanour/2018/34 | M/s Puritas (Pvt) Ltd No 25, Foster Lane, Colombo 10 |
|||
175 | Rehabilitation of Rantamba Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Uva Paranagama/RE/Rantamba/2018/36 | M/s Chathura Constructions Company(Pvt) Ltd No. 36, Bazaar Street, Badulla |
|||
176 | Construction of Buluwana Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Rathnapura/Godakawela/NEW/Buluwana/2017/35 |
M/s. USS Engineering (Pvt) Ltd 397, Galhitiyawa South, Ganemulla. |
|||
177 | Construction of 25m3/d Capacity Septage Treatment Plant at Thalawakele | MCPWS/WaSSIP/Urban/Septage - Thalawakele/2018/63 |
M/s. Central Engineering Services (Pvt) Ltd Central Base office, Digana Village, Rajawella, Kandy |
|||
178 | Rehabilitation of Mudagamuwa Rural Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Kandeketiya/RE/Mudagamuwa/2018/08 | M/s Chathura Constructions Company(Pvt) Ltd No. 36, Bazaar Street, Badulla |
|||
179 | Laying Pipes in Hulandawa South Rural Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Monaragala/NEW/Hulandawa South/2019/01 |
M/s H T S Engineering (Pvt) Ltd No: 10/23, Lake Drive Enclave, Colombo 08 |
|||
180 | Construction of Dombagammana Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Ratnapura/ Niwithigala/NEW/Dombagammana/2018/85 |
M/s.JN Construction (Pvt) Ltd, 52/4, Manaweriya, Kochchikade |
|||
181 | Supplying and Delivery of PVC/HDPE Pipes Fittings, Specials and Valves for Balance Work II in Distribution Line of Manthreethenna RWSS | MCPWS/WASSIP/Nuwara Eliya/ Walepane/ BW / Manthirithenna-04 /2019/ 04R |
M/s Central Industries PLC, No 312, Nawala Road, Nawala, Rajagiriya. |
|||
182 | Construction of Additional Work at Deiyanwala Rural Water Supply Scheme in Kegalle District | MCPWSHE/WaSSIP/Kegalle/Aranayaka/BW/Deiyanwala-01/2019/03 |
M/s. SMA Constructions (Pvt) Ltd No.53/1, Dambulla Road, Yaggapitiya, Kurunegala |
|||
183 | Construction of Bulathgama Rural Water Supply Scheme in Nuwara Eliya District | MCPWS/WaSSIP/Nuwara Eliya/Ambagamuwa/NEW/Bulathgama/2018/23 | M/s. Dimo (Pvt) Ltd, No 65, Jethawana Road, Colombo 11 | |||
184 | Construction of Dombagammana Rural Water Supply Scheme in Rathnapura District | MCPWS/WaSSIP/Ratnapura/ Niwithigala/NEW/Dombagammana/2018/85 | M/s.JN Construction (Pvt) Ltd, 52/4, Manaweriya, Kochchikade. | |||
185 | Construction of Kabulumulla Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kcgalle/Yatiyantota/NEW/Kabulumulla/2018/31 |
M/s Puritas (Pvt) Ltd, No: 100, Deans Road, Colombo 10 |
|||
186 | Construction of Retaining Wall in Miyanawita Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Deraniyagala/BW/Miyanawita - 01/2019/06 |
M/s. Malki Construction No: 467/A/4, Malawa, Kuruwita |
|||
187 | Construction of University of Jaffna Water Supply Scheme in Kilinochchi District | MCPWS/WaSSIP/ Kilinochchi/Karachichi/NEW/University of Jaffna/2019/15R |
M/s Expo Engineering No 21/24, Murugamoorthy Lane, Muthaly Kovilady, Kokuvil, Jaffna. |
|||
188 | Construction of Sangilipalama Rural Water Supply Scheme in Nuwara Eliya District | MCPWS/ WaSSIP/Nuwara Eliya/Kothmale/NEW/Sangilipalama/2018/20 |
M/s. Savinda Enterprises (Pvt) Ltd, No 176 F, Saranatissa Mawatha, Kahatuduwa, Polgasowita. and M/s Qingdao Flourish Metal Works Ltd, No 18, Gaoxiong Road, Qingdao, China |
|||
189 | Construction of Balance Work in Polkotuwa in Ganepalla RWSS | MCPWS/WaSSIP/Kegalle/NEW/Yatiyanthota/RE/Ganepalla-01/2018/60 | M/s Malki Construction, 467/A/4, Malawa, Kuruwita. | |||
190 | Galauda Central College Sanitation Improvement in Badulla District | MCPWS/WaSSIP/Badulla/NEW/SA/EA-Galauda Central Collage/2018/69 | M/s CISS Engineering, No.86, Kalulandayaya, Raththnapitiya, Monaragala. | |||
191 | Construction of Ponnagar - Barathipuram Water Supply Scheme in Kilinochchi District | MCPWS/WASSIP/Kilinochchi/Karachchi/BW/Ponnagar/2019/13 | M/s Puritas (Pvt) Ltd, No: 400, Deans Road, Colombo 10 | |||
192 | Construction of Latrine Balance Work of Edinburgh Estate in Nuwara Eliya District |
MCPWS/WASSTP/Nuwara Eliya/SA/Edinburgh/2019/09 |
M/s. D&S Grand Construction (Pvt) Ltd, No 334, Akkara 500, Embilipitiya | |||
193 | Construction of 25m3/d Capacity Septage Treatment Plant in Ruwanwella in Kegalle District | MCPWS/WaSSIP/Urban/NCB/Septage-Kegalle/ 2018/37 |
M/s. SMA Constructions (Pvt) Ltd N0.53/1, Dambulla Road, Yaggapitiya, Kurunegala |
|||
194 | Construction of Latrine Balance Work of Edinburgh Estate in Nuwara Eliya District | MCPWS/WaSSIP/NuwaraEliya/SA/Edinburgh/2019/09 | M/s Sion Lanka Engineering (Pvt) Ltd, No 81, Elapiliyawa, Mirigama | |||
195 | Construction of School Sanitation in Kilinochchi District Package 02 | MCPWS/WaSSIP/Kilinochchi/NEW/SA/EZ-Kilinochchi/ 2018/25-P2 | M/s Tech Centurions (Pvt) Ltd, No 314, Tellipalai Road, Vaddu North, Sithankerny | |||
196 | Supplying of GI Pipes, Fittings and Specials for Rehabilitation of RWS Schemes in Monaragala District. | MCPWS/WaSSIP/DSU - Monaragala/GI Pipes, Fittings & Specials/2018/30R |
M/s Allied Trading International (Pvt) Ltd Ifthikar Building, No. 301, Old Moor Street, Colombo 12 |
|||
197 | Construction of Ytiella Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Soranathota/NEW/Yatiella/2018/28 |
Ms. Central Engineering Services (Pvt) Ltd No: 415, Bauddhaloka Mawatha, Colombo 07 |
|||
198 | Construction of Public Toilet - Badulla Muthiyangana Viharaya in Badulla District | MCPWS/WaSSIP/Badulla/NEW/SA/EZ-Muthiyangana Viharaya/2018/60 | M/s Chathura Constructions Company(Pvt) Ltd No. 36, Bazaar Street, Badulla |
|||
199 | Construction of Hasalaka Rural Water Supply Scheme in Mahiyangana DSD in Badulla District | MCPWS/WaSSIP/Badulla/Mahiyanganaya/NEW/Hasalaka/2019/01 | M/s Mega Tech (pvt) Ltd. No 66/4, Havelock Road, Colombo 05 | |||
200 | Construction of Operation and Maintenance Office of Hakbellawaka Rural Water Supply Scheme in Kegalle District | MCPWS/WaSSIP/Kegalle/Yatiyanthota/NEW/Hakbellawaka-O & M Office//2019/49 | M/s Furni Dyanmic Engineering (Pvt) LTD No 235, Colombo Road, Pilimathalawa |
|||
201 | Construction of Ohiya Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Welimada/NEW/Ohiya/2018/02R | M/s WVP Construction Abeygunawardhana Hardware, New Road, Barawakumbuka |
|||
202 | Rehabilitation of Kalugahawadiya and Associated Rural Water Supply Schemes in Monaragala District | MCPWS/WaSSIP/Monaragala/Kalugahawadiya/RE/Group 18/2018/16 |
M/s. Praveganz Engineering, Weheragoda, Badalkumbura. |
|||
203 | Rehabilitation of Kunuwatta Water Supply Scheme in Badulla District | MCPWS/WaSSIP/Badulla/Uva Paranagama/RE/Lunuwattha/2018/35 |
M/s. KMC Construction Lanaka (Pvt.) Ltd. No. 76, Lakshauayana, Polonnaruwa |
|||
204 | Construction of Weligepola Rural Water Supply Scheme in Ratnapura District | MCPWS/WaSSIP/Ratnapura/Weligepola/NEW/Weligepola/2017/18-R | M/s. Sanken Construction, 295, Madampitiya Road, Colombo 14 | |||
205 | Construction of Balance Work in Treatment Plant at Anhettigama RWSS in Kegalle District | MCPWS/WaSSIP/Kegalle/Deraniyagala/BW/Anhettigama/ 2018/79 | M/s Amila Constructions, No.45, Karandupana, Kegalle. | |||
206 | Construction of Caretaker Office and Supplying and Laying of Pipes for New Housing Scheme 02 under Bridwell Water Supply Scheme in Nuwara Eliya District |
MCPWSHE/WASSIP/NuwaraEliya(PHDT)/Bogawana/BW/Bridwell-02/2019/12 |
M/s. Sooriyabandara Associates (Pvt) Ltd, No 114, Yatinuwara Veediya, Kandy |
|||
207 | Additional Work of Katugaha RWSS in Kegalle District | MCPWS/WaSSIP/Kegalle/Aranayake/BW/Katugaha-01/ 2019/02 |
M/s. Grant Engineering No 15F, Narendrasinghe Mawatha, Kundasale |
|||
208 | Construction of School Sanitation Facilities in Hatton Education Zone of Nuwara Eliya District | MCPWS/WaSSIP/Nuwara Eliya/SA/EZ - Hatton/2019/27 |
M/s. Sooriyabandara Associates (Pvt) Ltd, No 114, Yatinuwara Veediya, Kandy |
|||
209 | Rehabilitation of Dhahangama and Associated Rural Water Supply Schemes in Monaragala District | MCPWS/WaSSIP/Monaragala/Medagama/RE/Group 21/2018/25 |
M/s Chathura Construction Company (Pvt) Ltd, No.36, Bazaar Street, Badulla |
|||
210 | Construction of Diyathalawa Public Convenient Centre and Welimada Vijaya Maha Vidyalaya Sanitation Improvement (School) in Badulla District | MCPWS/WaSSIP/Badulla/NEW/SA/Diyathalawa & Welimada Vijaya/2018/66 | M/s HTS Engineering (Pvt) Ltd, No.50/1, Kudagama Rd, Manikkawatta, Avissawella | |||
211 | Rehabilitation of Labutuwa RWSS in Kegalle District | MCPWS/WaSSIP/Kegalle/Aranayake/RE/Labutuwa/2020/09 |
M/s. Grant Engineering No 15F, Narendrasinghe Mawatha, Kundasale |
|||
212 | Construction of Latrine Balance Work of Hope Estate in Nuwara Eliya District | MCPWS/WaSSIP/Nuwara Eliya (Plantation)/Hope/BW/Hope-I/2020/08 | M/s. Sion Lanka Engineering (Pvt) Ltd, No 81, Elapiliyawa, Mirigama | |||
213 | Supply & Delivery of DI/uPVC Pipes Fittings & Specials for Anhettigama RWSS in Kegalle District | MCPWS/WaSSIP/DSU-Kegalle/DI/uPVC Pipes Fittings & Specials/2019/44R |
M/s. MegaTech (Private) Limited No 66/4, Havelock Road, Colombo 05. |
|||
214 | Construction of 25m2/day Septage Treatment Plant in Monaragala District |
MCPWS/WaSSIP/Monaragala/Urban/Septage/2018/43 |
M/s HTS Engineering (Pvt) Ltd, No.50/1, Kudagama Rd, Manikkawatta, Avissawella | |||
215 | Construction of Orubandiwewa Rural New Water Supply Scheme - Phase III in Badulla District | MCPWS/WaSSIP/Badulla/Rideemaliyadda/NEW/Orubandiwewa-Phase III /2019/22 | M/s. Dimo (Pvt) Ltd, No 65, Jethawana Road, Colombo 11 | |||
216 | Construction of School Sanitation in Mullaitivu District | MCPWS/WaSSIP/Mullaitivu/SA/School Sanitation-Mullathivu/2018/50 | M/s. Lanka Construction, No 09, Mancholai Road, Kinniya -03 | |||
217 | Construction of Sanitation Facilities at Kegalu Vidyalaya & Others | MCPWS/WASSIP/Kegalle/SA/Kegalu Vidyalaya & Others/2019/22 | M/s. Kasthuri Arachchi Constructions, Sadun Niwasa, Temple Road, Ela-Ihala, Kolonna | |||
218 | Construction of Latrine in Dambana Area Stage IV in Badulla District | MCPWS/WaSSIP/Badulla/SA/Dambana Stage IV/2018/94 | M/s. Supun Construction and Suppliers (Pvt.) Ltd, No: 28, Bulupitiya Road, Badulla. | |||
219 | Construction of School/Hospital Sanitation Facility in Rathnapura District | MCPWS/WaSSIP/Ratnapura/SA/Public - Rathnapura/2019/41 | M/s HTS Engineering (Pvt) Ltd, No 50/1, Kudagama Road, Manikkawaththa, Avissawella | |||
220 | Construction of Selvanagar Larger Rural Water Supply Scheme in Kilinochchi District | MCPWS/WaSSIP/Kilinochchi/Karachchi/NEW/Selvanagar/2018/66 |
M/s. Q-S Joint Venture, M/s. Savinda Enterprises (Pvt) Ltd, No.176F, Saranathissa Mawatha, Kahathuduwa, Polgasowita. and M/s. Qingdao Flourish Metal Works Ltd, No 18, Gaoxiong Road, Qingdao, China. |
|||
221 | Rehabilitation of Nelumwewa Rural Water Supply Scheme in Monaragala District | MCPWS/WaSSIP/Monaragala/Sewanagala/RE/Nelumwewa/2020/01 | M/s WVP Construction Abeygunawardhana Hardware, New Road, Barawakumbuka |
|||
222 | Construction of Toilets for Kalupahana Estate Bulathkohupitiya in Kegalle District | MCPWS/WaSSIP/Kegalle/SA/Toilets-Kalupahana Estate/2019/28R | M/s Amila Constructions, No.45, Karandupana, Kegalle | |||
223 | Construction of Disable Toilets at Bulathkohupitiya at Kegalle District | MCPWS/WaSSIP/Kegalle/SA/Disable Sanitation-Bulathkohupitiya & Others/2019/29 | Director M/s. Kendaragama Construction, No. 62, Main Street, Rambukkana | |||
224 | Rehabilitation of Kuruwamba, Badullagammana and Associated Rural Water Supply Scheme in Monaragala District | MWS/WaSSIP/Monaragala/Kuruwamba, Badullagammana/RE/Group 15/2018/13 | M/s. Dockyard General Engineering Services (Pvt) Ltd, No. 223, Jayantha Mallimarchchi Mw, Colombo 14 | |||
225 | Supply and Delivery of PE, uPVC Pipes, Fittings and Accessories for Rehabilitation of RWS Scheme Batch 01 in Rathnapura District. | MWS/WaSSIP/DSU - Rathnapura/uPVC Pipes-Batch 01/2019/04 |
M/s Central Industries PLC, No 312, Nawala Road, Nawala, Rajagiriya. |
|||
226 | Balance Work of Mulathivu Septate Treatment Plant in Mulathivu District | MWS/WaSSIP/Mullathivu/Maritimpattu/BW/Mullathivu-Septage/2020/13 | M/s. EES & Construction, Track 29/66, “Amila Nuwan” Attanakadawala | |||
227 | Construction of Plantation in Nuwaraeliya Region WSS Balance Work in Nuwaraeliya District | MCPWS/WaSSIP/Nuwaraeliya (Plantation)/BW/Batch - 01/2020/03 | M/s. Malwatta Construction No 119, Gampola Road, Ulapane | |||
228 | Construction of Latrine Balance Work of Ilope Estate in Nuwara Eliya District | MCPWS/WaSSIP/NuwaraEliya (Plantation)/Hope/BW/Hope-1/2020/08 | M/s. Vision Construction, No 194, Main Street, Punduluoya | |||
229 | Rehabilitation of Udawela Rural Water Supply Scheme in Badulla District. | MWS/WaSSIP/Badulla/Passara/RE/Udawela/2019/03 | M/s. OMAT Engineering (Pvt) Ltd, No. 47, Kalugalpitiya, Badulla. | |||
230 | Construction of Kilinochchi New Water Supply Scheme - Water Treatment Plant Construction (Package 02) | MCPWS/WaSSIP/Kilinochchi/Karachchi/NEW/WTP - Package 2/2019/17 | M/s. Sierra Construction Limited, No. 112, Havelock Road, Colombo 05 | |||
231 | Construction of 25m3/d Capacity Septage Treatment Plant at Weligepola in Rathnapura District. | MWS/WaSSIP/Ratnapura/Urban/NCB/Septage- Weligepola/2019/42 | M/s SMA Construction (PVT) LTD No. 53/1, Dambulla Road, Yaggapitiya, Kurunagala | |||
232 | Rehabilitation of Siyambalanduwa Water Supply Project in Siyambalanduwa DS Division in Monagarala District. | MWS/WaSSIP/Monaragala/Siyambalanduwa/RE/Siyambalanduwa/2019/04 |
M/s. MegaTech (Private) Limited No 66/4, Havelock Road, Colombo 05. |
|||
233 | Construction of Indigenous Toilet at Rathugala in Monaragala District |
MCPWS/WaSSIP/Monaragala/NEW/SA/Toilet Facility-Rathugala/2018/39R |
M/s Lanra Construction, No.112, Mahiyangana Rd, Bibile. |
|||
234 | Reliabilitation of Unduguda and Moradana RWSS in Kegalle District | MCPWS/WaSSIP/Kegalle/Kegalle/RE/Undugoda/2018/83R | Director M/s. Luminex (Pvt) Ltd, No.24, New Galle Road, Moratuwa | |||
235 | Construction of Kadigamuwa Rural Water Supply Scheme in Kegalle District | MWS/WaSSIP/Kegalle/Galigamuwa/NEW/Kadigamuwa/2018/81 | Director M/s. Ackwell Engineers, No.81/3A, 1st Lane, Koswatta Road, Rajagiriya | |||
236 | Rehabilitation of Mahagama Jeewana Rural Water Supply Scheme in Monaragala District | MWS/WaSSIP/Monaragala/Sewanagala/RE/Mahagama Jeewana/2020/02 | M/s Chathura Construction Company (Pvt) Ltd, No 36, Bazaar Street, Badulla | |||
237 | ehabilitation of RWSS in Deraniyagala DSD in Kegalle District | MWS/WaSSIP/Kegalle/Deraniyagala/RE/Stage-01/2019/12 |
M/s. Labiru Construction No.7/17, Maligatennewatta, Alugolla, Nalanda |
|||
238 | Rehabilitation of Bibilemulla and Associated Rural Water Supply Schemes in Monaragala District | MCPWS/WaSSIP/Monaragala/Medagama/RE/Group20/2018/24R | M/s Mech Pump Systems (Pvt) Ltd, No.521, 1/1, Negombo Rd, Peliyagoda | |||
239 | Rehabilitation of RWSS in Deraniyagala DSD in Kegalle District | MWS/WaSSIP/Kegalle/Deraniyagala/RE/Deraniyagala Stage 3 (Poddenikanda) 12019/38 | Director M/s. JN Construction (Pvt) Limited, No.52/4, Manaweriya, Kochchikade | |||
240 | Construction of Panaliya Rural Water Supply Scheme in Kegalle district | MWS/WaSSIP/Kegalle/Polgahawela/NEW/Panaliya/2019/20 |
M/s. Ananda Constructions (Pvt) Ltd, No.3/28B, 1st Lane, Katuwawala Mawatha, Borelesgamuwa. |
|||
241 | Construction of Latrine in Dambana Area – Stage V in Badulla District |
MCPWS/WaSSIP/Badulla/SA/Dambana - Stage V/2018/95R |
M/s Dusantha Constructions, Galhena, Kanahela, Passara | |||
242 | Construction of Temple Sanitation in Rambukkana DSD in Kegalle District | MWS/WaSSIP/Kegalle/SA/Temple-Rambukkana/2020/03 | M/s. Kasthuri Arachchi Constructions, Sadun Niwasa, Temple Road, Ela-Ihala, Kolonna | |||
243 | Rehabilitation of Arukgammana RWSS in Kegalle district | MWS/WaSSIP/Kegalle/Galigamuwa/RE/Arukgammana/2020/23 | M/s Solanco Engineering Services (Pvt) Ltd, No.274, Saranajothi Mawatha, Thelawala Road, Mount Lavinia. | |||
244 | Rehabilitation of Warakapane Rural Water Supply Scheme in Kegalle District Stage-1 | MWS/WaSSIP/Kegalle/Mawanella/RE/Warakapane-Stage-01/2020/07 | M/s. Grant Engineering No 15E, Narendrasinghe Mawatha, Kundasale | |||
245 | Balance work of Oddusuddan, Puthukudiyiruppu and Mullaitivu Urban Water Supply Schemes in Mullaitivu District | MWS/WaSSIP/Mullaithiyu/Puthukudiyiruppu/BW/Oddusuddan/2020/14 | M/s. Osheemar Engineering (Pvt) Ltd, No.145, Maligakanda Road, Colombo 10 | |||
246 | Supply and Delivery of 15,000 Nos. Volumetric Displacement Type 15 mm Diameter Domestic Water Meters | MWS/WaSSIP/PMU/NCB/Water Meters-Lot 02/2020/18 |
M/s. Access International (Pvt) Ltd, “Access Towers”, No: 278, Union Place, Colombo 02. |
|||
247 | Supply and Delivery of Gully Emptier (Lot 02). | MWS/WaSSIP/PMU/NCB/Gully Emptiers (Lot 02)/2018/71 |
M/s. Solex Technologies (Pvt) Ltd, No: 39, New Nuge Road, Peliyagoda |
|||
248 | Supply and Delivery of Generators for NWSDB - Sabaragamuwa | MWS/WaSSIP/PMU/NCB/Generator - NWSDB/2020/19 | M/s. Trade Promoters (Pvt) Ltd, No: 272/25,Sudharshana Mawatha,Malambe. |
|||
249 | Supply and Delivery of Generators for NWSDB - Sabaragamuwa | MWS/WaSSIP/PMU/NCB/Generator - NWSDB/2020/19 | M/s. NativeWay (Pvt) Ltd, No: 549,Sri Sangaraja Mawatha,Colombo 10 |
|||
250 | Construction of Kilinochchi New Water Supply Scheme - Water Treatment Plant Construction (Package 1) | MCPWS/WaSSIP/Kilinochci/Karachchi/NEW/WTP-Package 1/2019/14 | M/s. Dimo (Pvt) Ltd, No 65, Jethawana Road, Colombo 11 | |||
251 | District Engineer's Office Renovation & Construction Works-Kilinochchi | MCPWS/WaSSIP/DSU-Kilinochchi/Renovation-DE Office/2019/19 | M/s. Samsiya Construction, 22/17, Veppankulam, Vavuniya. | |||
252 | Sanitation Improvement Project in Sripada Stage 01 in Nuwara Eliya District. | MWS/WaSSIP/Nuwaraeliya/SA/Public-Sri Pada/2020/10R | M/s. Luminex (Pvt) Ltd, No.24, New Galle Road, Moratuwa | |||
253 | Constructions of School Sanitation in Kilinochchi District-Package 01 | MCPWS/WaSSIP/Kilinochchi/NEW/SA/EZ-Kilinochchi-P1/2019/18 | M/s. Tech Centurions (Pvt) Ltd, No.314, Tellipalai Road, Vaddu North, Sithankerny. | |||
254 | Construction of Strathdon Balance Work in Nuwaraeliya District | MWS/WaSSIP/NuwaraEliya(Plantation)/NS/BW/Strathdon/2020/18 | M/s Furni Dyanmic Engineering (Pvt) LTD No 235, Colombo Road, Pilimathalawa |
|||
255 | Rehabilitation of Kandepuhulpola Rural Water Supply Scheme in Welimada DSD in Badulla District | MWS/WaSSIP/Badulla/Welimada/RE/Kandepuhulpola/2019/04 | M/s Chathura Construction Company (Pvt) Ltd, No 36, Bazaar Street, Badulla | |||
256 | Construction of Welanvita Rural Water Supply Scheme in Badulla District. | MWS/WaSSIP/Badulla/Haldumulla/New/Kumarathenna & Welanvita/2020/16 | M/s. Sysmex Engineering (Pvt) Ltd, Lark Nest, Diyathalawa Road, Ellethota, Bandarawela | |||
257 | Rehabilitation of Group 08 (Walapane) Nuwara Eliya Rural Water Supply Scheme | MWS/WaSSIP/NuwaraEliya/Walapane/RE/Group 08/2020/05 | M/s. AMSK Constructions (Pvt) Ltd, No. 1/29, New Town, Madampe. | |||
258 | Construction of Balance Work at Miyanawita RWSS in Kegalle District | MWS/WaSSIP/Kegalle/Deraniyagala/BW/Miyanawita-02/2020/26 | M/s. SMA Constructions (Pvt) Ltd No.53/1, Dambulla Road, Yaggapitiya, Kurunegala | |||
259 | ipe Laying & Providing 100 House Connections for New Housing Scheme in Bogawana Division In Bogawana Estate | MWS/WaSSIP/DSU-Nuwara Eliya/NS/Laying of Pipes-Bugawana/2020/16R |
M/s. Sooriyabandara Associates (Pvt) Ltd, No 114, Yatinuwara Veediya, Kandy |
|||
260 | Rehabilitation of Mahalanda Rural Water Supply Scheme in Badulla District | MWS/WaSSIP/Badulla/Haldumulla/RE/Mahalanda/2019/02 | M/s Ackwell Engineering, No. 81/3A, 01st Lane, Koswattha, Rajagiriya | |||
261 | Rehabilitation of Kiribbanwewa and Janakapura WSS in Mullaitivu District | MWS/WaSSIP/Mullaitivu/Welioya/RE/Kiribbanwewa/2020/21 | M/s. Lachan Construction, Kadawathgama, Medawachchiya | |||
262 | Deraniyagala South Rural Water Supply Scheme in Kegalle District | MWS/WaSSIP/Kegalle/Deraniyagala/NEW/Deraniyagala South/2017/68 | M/s Puritas (Pvt) Ltd, No: 400, Deans Road, Colombo 10 | |||
263 | REHABILITATION OF RWSS IN YATIYANTOTA DSD IN KEGALLE DISTRICT | MWS/WaSSIP/Kegalle/Yatiyanthota/RE/Yatiyanthota Stage1/2019/13 | M/s. JN Construction (Pvt) Limited, No.52/4, Manaweriya, Kochchikade | |||
264 | REHABILITATION OF RAKWANA SMALL TOWN RURAL WATER SUPPLY SCHEME IN RATHNAPURA DISTRICT | MWS/WaSSIP/ RATNAPURA/GODAKAWELA/RE/RAKWANA/2017/53R | M/s. Ananda Constructions (Pvt) Ltd, 3/28B, 1st Lane, Katuwawala Mw, Borclcsgamuwa | |||
265 | CONSTRUCTION OF STP ACCESS CONCRETE ROAD IN KILLINOCHCHI DISTRICT | MWS/WaSSIP/Kilinochchi/NS/Karachchi/BW/Access Road-WTP/2021/05 | M/s Meera Civil Engineering Constructions, “Nantha” Illam, Chetty Street, Point Pedro | |||
266 | REHABILITATION OF RATHNODAGAMA AND ASSOCIATED RURAL WATER SUPPLY SCIIEMES IN BADULLA DISTRICT | MWS/WaSSIP/Badulla/Uva Paranagama/RE/Rathnodagama/2020/09R | M/s Sysmex Engineering (Pvt) Ltd, Lark Nest, Diyathalawa Rd, Ellethola, Bandarawela | |||
267 | BALANCE PIPE LAYING WORK IN PALLEPELPITA RWSS IN KEGALLE DISTRICT | MWS/WaSSIP/Kegalle/NCB/BW/Pipe Laying-Pallepelpita/2021/02 | M/s JCK Construction (Pvt) Ltd, No 154, Horana Road, Weedagama, Bandaragama | |||
268 | Construction of Udubadana Rural Water Supply Scheme in Badulla District | MWS/WaSSIP/Badulla/Welimada/NEW/Udubadana/2020/17 | M/s Chathura Construction Company (Pvt) Ltd, No.36, Bazaar Street, Badulla | |||
269 | Construction of balance work of plantation WSS in Hatton region in Nuwara Eliya District | MWS/WaSSIP/Nuwara Eliya(Plantation)/NCB/BW/Plàntation-Hatton/2020/22 | M/s. Furni Dynamic Engineering (Pvt) Ltd, No 235, Colombo Road, Pilimathalawa | |||
270 | SUPPLY & DELIVERY OF DI PIPES, FITTINGS & ACCESSORIES FOR BALANCE PIPE LAYING WORK IN PALLEPELPITA RURAL WATER SUPPLY SCHEME IN KEGALLE DISTRICT | MWS/WaSSIP/DSU-Kegalle/NCB/BW/DI pipes, Fittings & Accessories- Pallepelpita/2021/03 | M/s PCAS Consortium (Pvt) Ltd, No. 83C, Egodawatta, Ambalangoda, Polgasowita | |||
271 | Rehabilitation of Balumgala and Associated (Group 07) Rural Water Supply Scheme in Badulla District | MWS/WaSSIP/Badulla/Welimada/RE/Balumgala/2020/11 |
M/s Liyanage Constructions, Manampita, Thalgaswala, Galle |
|||
272 | Supply & Installation of Pumps of Existing Rural WSS in Welioya DS Division in Mullaitivu District | MWS/WaSSIP/Mullaithivu/ NCB/Supply & Installation of Pumps - Welioya/2020/19R | M/s. MegaTech (Pvt) Ltd, 66/4, Havelock Road, Colombo 05 | |||
273 | Construction of 750 CUM/DAY Package Treatment Plant for Pallebadda Small Town Water Supply Scheme in Ratnapura District | MWS/WaSSIP/Ratnapura/SA/Package Treatment Plant -Pallebadda/2020/01 | M/s. RS Projects (Pvt) Ltd, No. 13A, Oruthota, Gampaha | |||
274 | Pipe Laying of Avissawella Road in Kegalle District. | MWS/WaSSIP/Kegalle/Galigamuwa/Urban NCB/Additional Pipe Laying-Awissawella Road/2020/30 |
M/s. Ananda Constructions (Pvt) Ltd, No.3/28B, 1st Lane, Katuwawala Mawatha, Borelesgamuwa |
|||
275 | Supply & Delivery of PE, uPVC Pipes, Fittings & Accessories for Rehabilitation Schems Batch - 02 in Rathnapura District | MWS/WaSSIP/DSU - Ratnapura/NCB/uPVC pipes - Batch 02/2021/11 | M/s Central Industries PLC,
No 312, Nawala Road, Nawala, Rajagiriya. |
|||
276 | Rehabilitation of Thennakoonwela and Associated (Group 8) Rural Water Supply Scheme in Badulla District | MWS/WaSSIP/Badulla/Welimada/RE/Thennakoonwela/2020/08 | M/s Sysmex Engineering (Pvt) Ltd, Lark Nest, Diyathalawa Rd, Ellethola, Bandarawela | |||
277 | Balance Work in Deliwa Water Supply Scheme in Monaragala District | MWS/WaSSIP/Monaragala/NCB/Madulla/BW/Deliwa/2021/06 | M/s. Browns Engineering & Construction (Pvt) Ltd, Level 04 & 05, Browns Capital Building, 19, Dudley Senanayake Mawatha, Colombo 08. | |||
278 | Construction of Valve Chambers, Flowmeter Chambers and Outfall Structures for Pipe Network of Pambahinna WSS in Rathnapura District. | MWS/WaSSIP/Ratnapura/NCB/BW/Pambahinna 2/2021/14 | M/s. Brians Engineers (Pvt) Ltd, 84/2, Doctors Garden, Pepiliyana Road, Nugegoda | |||
279 | Construction of Strathspey Janapadaya - Agara Oya Urban (RH) Water Supply Scheme in Nuwaraeliya District | MWS/WaSSIP/Nuwara Eliya/Urban/NCB/Strathspey/AF/2021/06 | M/s. Platinum Holdings Lanka (Pvt) Ltd, No. 26/1, Shobana Place, Asiri Uyana, Katubedda | |||
280 | Rehabilitation of Dhobemada (Maligathenna) Rural Water Supply Scheme in Kegalle District | MWS/WaSSIP/Kegalle/NS/Rambukkana/RE/Dhombemada (Maligathenna)/2020/15 | M/s. Grant Engineering No 15E, Narendrasinghe Mawatha, Kundasale | |||
281 | Construction of Badulla Septage Treatment Plant in Badulla District | MWS/WaSSIP/Badulla/Urban/NCB/Septage - Badulla/AF/2021/10 | M/s. OMAT Engineering (Pvt) Ltd, No. 47, Kalugalpitiya, Badulla. | |||
282 | Rehabilitation of Nildandahinna Urban Water Supply Scheme in Nuwara Eliya District | MWS/WaSSIP/Nuwara Eliya/Walapane/Urban/Nildandahinna/AF/2021/08 | M/s Acwell Engineering Services (Pvt) Ltd, "Acwell Court", No. 81/3A, 01st Lane, Koswattha, Rajagiriya | |||
283 | Construction of Kumarapuram Urban Water Supply Scheme in Kilinochchi District | MWS/WaSSIP/Kilinochchi/Urban/NCB/Kumarapuram/AF/2021/12 | M/s Acwell Engineering Services (Pvt) Ltd, "Acwell Court", No. 81/3A, 01st Lane, Koswattha, Rajagiriya | |||
284 | Construction of Katawala Rural Water Supply Scheme in Badulla District | MWS/WaSSIP/Badulla/Haliela/NEW/Katawala/2020/13 | M/s. Dimo (Pvt) Ltd, No 65, Jethawana Road, Colombo 11 | |||
285 | Rehabilitation of Parakramagama Rural Water Supply Scheme in Kegalle District | MWS/WaSSIP/Kegalle/Warakapola/NS/RE/Parakramagama/2020/20 | M/s. Amila Constructions, No. 45, Karandupana, Kegalle | |||
286 | Supply & Installation of Dissolved Air Flotation (DAF) Facility for Kilinochchi Water Supply Scheme | MWS/WaSSIP/Kilinochchi/NCB/Supply & Installation of DAF/2021/19 | M/s Puritas (Pvt) Ltd, No: 400, Deans Road, Colombo 10 | |||
287 | Construction of Meedumpitiya & Sapuroda Water Supply Scheme in Badulla District | MWS/WaSSIP/Badulla/Rural/NCB/Meedumpitiya & Sapuroda/AF/2021/06 | Ms. Marval Icon Pvt Ltd, 973/9/5, 2nd Lane, Annasiwatta Road, Athurugiriya. | |||
288 | Construction of Uruthirapuram Urban Water Supply Scheme in Kilinochchi District | MWS/WaSSIP/Kilinochchi/Urban/NCB/Uruthirapuram/AF/2021/13 | M/s Acwell Engineering Services (Pvt) Ltd, "Acwell Court", No. 81/3A, 01st Lane, Koswattha, Rajagiriya | |||
289 | Supply & Delivery of DI Pipes & Fittings for Diyathalawa Water Supply Scheme in Badulla District | MWS/WaSSIP/Badulla/NCB/Diyathalawa - DI Supply/2021/14 | M/s PCAS Consortium (Pvt) Ltd, No. 83C, Egodawatta, Ambalangoda, Polgasowita | |||
290 | Construction of Iththakanda Rural Water Supply Scheme in Rathnapura District | MWS/WaSSIP/Ratnapura/Kolonna/NEW/Iththakanda/2021/10 | Ms. Vasiri Construction Company (Pvt) Ltd, 164, Kesbewa Road, Boralesgamuwa | |||
291 | Construction of Latrine Balance Work 1 of Glassaugh Estate in Nuwara Eliya District | MWS/WaSSIP/Nuwaraeliya/SA/Glassaugh/2021/11 |
Ms. Supun Construction & Suppliers (Pvt) Ltd, No28, Budulupitiya Road, Badulla |
|||
292 | Construction of Latrine Balance Work 2 of Glassaugh Estate in Nuwara Eliya District | MWS/WaSSIP/Nuwaraeliya/SA/Glassaugh-2/AF/2021/25 | Ms. Supun Construction & Suppliers (Pvt) Ltd, No28, Budulupitiya Road, Badulla | |||